Datenanalyse der ProKilowatt-Programme Effienergie

Schlussbericht im Auftrag des BFE vom 16.1.2020

Continue reading…


IEA PVPS Task 13: Analysis of Long-Term Performance of PV Systems

This IEA PVPS Task 13 report investigates data supplied from installed operating PV plants in different countries in order to improve understanding of efficiency and reliability issues of current state-of-the-art PV systems. With TNC Consulting (Th. Nordmann, L. Clavadetscher) as main-author! Continue reading…


Potential von Photovoltaik an Schallschutzmassnahmen entlang von Nationalstrassen

Forschungsauftrag ASTRA 2010/2009 auf Antrag des Bundesamtes für Strassen (ASTRA), Dezember 2012

Erarbeitete Studie von TNC, Thomas Nordmann, Thomas Vontobel und Ralph Lingel


Stromeffizienz und erneuerbare Energien – Wirtschaftliche Alternative zu Grosskraftwerken

Investition in Stromeffizienz und erneuerbare Energien … Schlussbericht 2010

TNC und INFRAS haben im Auftrag der Umweltorganisationen (WWF, Greenpeace, SES, Pro Natura), den Kantonen Basel-Stadt und Genf sowie mit Unterstützung von Energie Wasser Bern (ewb) die Auswirkungen der Investitionsstrategien “Grosskraftwerke” und “Stromeffizienz und erneuerbare Energien” untersucht. Continue reading…


IEA Report on cost and performance trends in photovoltaic systems

December 2007, TNC Consulting AG, Erlenbach, Switzerland

This technical report has been prepared under the supervision of PVPS Task 2 by Luzi Clavadetscher, Thomas Nordmann. This report gives an overview of the system costs of PV systems, based on data collected as part of the IEA PVPS Task 2 Economic Survey and of the operational performance, based on data from the IEA PVPS Performance Database.  Continue reading…


Investitionsprogramm Energie 2000

Nachbefragung und Erfolgskontrolle durch TNC für das damalige Investitionsprogramm Energie 2000, Schlussbericht 2005


Progress in Photovoltaics: Research and Applications

2004 John Wiley & Sons, Ltd.
PV on noise barriers has been around for 14 years. During this time considerable progress has been achieved not only on the PV module technology, but also in the construction of photovoltaic noise barriers (PVNB). The first plant was built in Switzerland in 1989; at present there are numerous plants with a total documented power of about 850 kWp in operation in Europe. This paper gives a short overview on the progress and state of the art of PVNB in Europe.